MAINTENANCE & REPAIR OF “AGIOS NIKOLAOS” JETTY AT THE PORT OF ZAKYNTHOS
THE CHALLENGES
New stamped concrete floor, molding, concrete structures, installation of PVC-U drainage pipes and cast iron grates.
PROJECT DETAILS
| Categories: | |
| Client: | HARBOR FUND OF THE PORT OF ZAKYNTHOS |
| Location: | PORT OF ZAKYNTHOS |
| Completed: | 2017-2018 |
| Value: | 100.000,00€ |


